Smart Trade Insights
  • Business
  • Economy
  • Investing
  • Politics
Top Posts
Term Sheet to Treat Colorado Project Uranium Waste...
Boliden Strikes C$20 Million Deal with Golden Sky...
CoTec Holdings Corp. Notes HyProMag USA Press Release...
Empire Metals Limited Announces Interim Results
Alvopetro Announces August 2025 Sales Volumes
10 Generative AI Stocks to Watch as ChatGPT...
How to Invest in Lithium Stocks and the...
Notice of General Meeting
Trump family’s American Bitcoin makes stock market debut
Apple has survived Trump’s tariffs so far. It...
  • Business
  • Economy
  • Investing
  • Politics

Smart Trade Insights

Investing

Ore Reserve Quadruples for Rhyolite Ridge Project; Reaffirms Robust Project Economics

by admin June 2, 2025
June 2, 2025
Ore Reserve Quadruples for Rhyolite Ridge Project; Reaffirms Robust Project Economics

Ioneer Ltd (ASX: INR, Nasdaq: IONR) (Ioneer) is pleased to announce a 308% upgrade to the Ore Reserve estimate for its 100%-owned Rhyolite Ridge Lithium-Boron Project (‘Rhyolite Ridge’ or the ‘Project’) in Nevada, USA, alongside updated Project economics.

  • Rhyolite Ridge Ore Reserve more than quadrupled from 60 million tonnes in 2020 to 247 million tonnes, delivering a mine life of 95 years
  • Ore Reserve now contains a total of 1.92 Mt of lithium carbonate equivalent and 7.68 Mt of boric acid equivalent
  • Underpinning plans for a large, long-life, low-cost expandable operation, producing lithium carbonate, boric acid and then battery-grade lithium hydroxide
  • Stable co-product – boric acid accounts for an average 25% of annual revenue in the first 25 years; helping ensure positive EBITDA at low lithium prices and EBITDA margin of 65.7% based on average production over first 25 years
  • All-in sustaining cash cost of US$5,745 per metric tonne lithium carbonate equivalent places the Rhyolite Ridge Project in the bottom of the global lithium cost curve
  • Compelling Project economics with an after-tax NPV of US$1.367 billion, and an unlevered, after-tax internal rate of return (IRR) of 14.5%

The Ore Reserve has increased by 186.6 million tonnes (Mt) and approximately 48% of the Mineral Resource has been converted into Reserve, now estimated at:

  • 246.6 Mt at 1,464 ppm lithium and 5,444 ppm boron
  • Containing 1.92 Mt of Lithium Carbonate Equivalent (LCE) and 7.68 Mt of Boric Acid Equivalent (BAE)

“Today’s updated Reserve and Mine Plan reinforces the importance of Rhyolite Ridge’s remarkable mineralogy. Our Ore Reserve estimate of 247 Mt containing a total of 1.92 Mt LCE and 7.68 Mt BAE make it the largest lithium-boron Reserve in the world,” said Bernard Rowe, Managing Director, Ioneer. “It allows Ioneer to match prevailing market conditions and blend or prioritise ore to produce a valuable boric acid co- product, whose market is uncorrelated with the Project’s primary lithium product. No other lithium project offers this level of flexibility and economic advantage. In periods of low cycle lithium pricing, like today, we plan to prioritize the high-boron ore production to optimize the relative proportion of total revenue derived from boric acid.”

By prioritising High-Boron (Hi-B) ore in the first 25 years of production, the Project is poised to produce an average of ~19,200 tonnes per annum (tpa) of LCE, and 116,400 tpa of boric acid (see Table 1).

The updated Ore Reserve estimate, 95-year mine plan for stage one operations, and Project economics reaffirms Rhyolite Ridge as a highly attractive global Project to produce lithium carbonate, lithium hydroxide and boric acid. The updated findings position Ioneer, on an LCE basis, in the lowest cost quartile for lithium production globally with an estimated all-in sustaining cash cost to produce battery grade lithium hydroxide of US$5,745 and a cash cost of C1 $3,858 per tonne net of expected boric acid revenue in the first 25 years.

The Project has a stable overall operating cost structure to produce lithium carbonate and battery grade lithium hydroxide due to the scale and reliability of its boric acid credit. Boron remains one of the most stable natural resource commodities over many decades.

Ioneer has refined Project plans over the past four years and updates now include an Association for the Advancement of Cost Engineering (AACE) Class 2 capital cost estimate (-10%, +15%) with approximately 70% of the Project’s engineering complete. As a result of this and other engineering work including RAM analysis and detailed engineering design, Ioneer has adopted a more conservative approach to plant availability, equipment downtime and maintenance strategies. While this approach reduces bottom line economics, the Company believes it is appropriate for a Project of this type and scale.

The Company now estimates total capital expenditure to complete the Project will be US$1,667.9 million, including a 10% contingency.

Click here for the full ASX Release

This post appeared first on investingnews.com

previous post
Harmony Gold to Acquire MAC Copper in US$1.03 Billion Deal
next post
Cardiex Receives TGA Approval for CONNEQT Pulse Device

You may also like

Corporate Activity Update and Appointment of CEO Designate

November 29, 2024

Heritage Mining Identifies Intrusion-Related Mineralization at Zone 3

September 21, 2024

The Trader’s Flashlight in a Market Fog: What...

April 15, 2025

AC Drilling Commences on Priority Targets at Ferke...

March 12, 2025

Fortune Bay Announces Option Agreement for the Woods...

August 5, 2025

Cygnus Metals Limited: Issue of Performance Rights

July 12, 2025

Surface Exploration Results Reveal Ni and Cu Geochem...

December 2, 2024

Tech 5: US Lifts EDA Restrictions for China,...

July 6, 2025

BTV Highlights: North American Iron, West Red Lake...

July 6, 2025

Trading Halt

December 6, 2024

    Fill Out & Get More Relevant News


    Stay ahead of the market and unlock exclusive trading insights & timely news. We value your privacy - your information is secure, and you can unsubscribe anytime. Gain an edge with hand-picked trading opportunities, stay informed with market-moving updates, and learn from expert tips & strategies.

    Recent Posts

    • Term Sheet to Treat Colorado Project Uranium Waste Dumps and Gross Revenue Sharing Agreement with DISA Technologies

      September 5, 2025
    • Boliden Strikes C$20 Million Deal with Golden Sky for BC Copper Project

      September 5, 2025
    • CoTec Holdings Corp. Notes HyProMag USA Press Release Regarding Capacity Expansion Concept Study

      September 5, 2025
    • Empire Metals Limited Announces Interim Results

      September 5, 2025
    • Alvopetro Announces August 2025 Sales Volumes

      September 5, 2025
    Promotion Image

    banner ads

    Categories

    • Business (851)
    • Economy (829)
    • Investing (2,761)
    • Politics (737)
    • Privacy Policy
    • Terms & Conditions

    Disclaimer: smarttradeinsights.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.


    Copyright © 2025 smarttradeinsights.com | All Rights Reserved